Photovoltaic system expansion stage I

Photovoltaic system expansion stage I

Since 02.06.2019, the photovoltaic system expansion stage I with 200m² panel surface in operation. With this area an average power production of 150 KW / h per day is possible for now. The electricity is used entirely for our production facilities. Outside operating hours, a battery system is available for storage that works without the use of rare earths and based on salt water. 
If the system proves its worth, investments will be made in expansion stage II after the summer break. We would like to thank our partner \ "Electricity from the roof"Thank you for the excellent work.

RBS Areas

Tagged


© SENN Gruppe

This page uses cookies
and processes your personal data (e.g., IP address) to, for example, personalize content and ads, incorporate third-party media, or analyze traffic on our website. Data processing can also occur through the setting of cookies. We share this data with your consent to third parties, which we name and explain in the Privacy Policy in the Legal Notice.