Posten in Shares.
Photovoltaic expansion stage 2
Written by KS Kneissl & Senn Technologie GmbH Written on .
Photovoltaic expansion stage 2
With regard to climate targets and environmental protection, a further 600 m² of PV panels were put into operation.
In addition to the expansion of the PV system, two diesel vehicles from our vehicle fleet were also replaced with electric cars. A specially installed charging unit (wallbox) always gives us the opportunity to refuel directly at the company site in Erl from 100% green electricity.